Location:Home > detail
Location: Home > Core Business > Global Business
Dapdapia Bridge, Bangladesh
Source:MBEC Date:2019年03月15日

The bridge over the Kirtonkhola River consists of the main bridge and two approach bridges over both sides. The total length of bridge is 1390m and the width is 10m. The span arrangement is: 12 spans of 30m simple supported I-beam + (48.5m+6 ×85.5m+48.5m) pre-stressed continuous concrete box girder with variable cross sections +14 spans of 30m simple supported I-beam. It was commenced in October 2006 and completed in December 2010.

Dapdapia Bridge 

Papdapia Bridge

 

 

 

Print Close